Continuous follow-through

Follow-up

Every established patient on a care plan. The AI keeps each one moving through imaging, conservative care, their insurer's requirements and follow-up visits, and flags anyone who falls off.

MVP step · Watch the AI follow a patient through Jeff's pathwaysPick lower back pain, neck pain (myelopathy) or a compression fracture, and watch weeks of follow-through in a minute: missed steps rescued, insurer checklist filled, next visit booked.
Active care plans
18
Established patients being followed
AI follow-ups this week
14
Texts, calls and requests for notes
Where patients are on their pathwaySee the three pathways
3Screening & imaging
8Insurer checklist
18Conservative care
8Pre-surgery
0Surgery

Nancy Silva

L4–5 disc herniation · Radiculopathy · dermatomal

Avoid surgery if conservative care works; microdiscectomy if it does not

Lower back pain Aetna EPDr. Elena Park Ready for pre-approval
  1. First visit Done Jul 7
  2. MRI correlation Done Jul 16 Pre-req
  3. At least 6 weeks of in-person physical therapy Done Aug 25 Pre-req
  4. Proof: PT notes or claims Done Aug 28 Pre-req
  5. Medications Done Aug 4 Pre-req
  6. 6-week follow-up visit Missed · due Aug 25 Follow-up
  7. Surgery pre-approval · Aetna Due Sep 15 Pre-req
  8. Pre-surgery consult Due Sep 21 Pre-req
  9. Surgery Due Oct 5
Aetna checklist Aetna · As supplied to Jeff · policy link to add
At least 6 weeks of in-person physical therapyDone
Proof: PT notes or claimsDone
MedicationsDone
3 of 3 needed
Missed: 6-week follow-up visit Due Aug 25 · Not booked by the patient · AI followed up 4× (last 4 d ago)
  • Followed up again on the 6-week follow-up visit; escalates to the front desk after one more try
  • Sent two open times this week

Mei Lee

L2 compression fracture · No red flags, no DISH

Heal with a brace if stable; kyphoplasty if it qualifies

Compression fracture Blue Shield of California EPDr. Elena Park Needs attention
  1. First visit Done Jul 3
  2. MRI to establish acuity Overdue · due Jul 10 Pre-req
Overdue: MRI to establish acuity Due Jul 10 · MRI not scheduled yet · AI followed up 3× (last 2 h ago)
  • Followed up again on the mri to establish acuity; escalates to the front desk after one more try
  • Called the patient, left a voicemail

Brian Moore

L1 compression fracture · No red flags, no DISH

Heal with a brace if stable; kyphoplasty if it qualifies

Compression fracture Health Net BMDr. Brandon McCutcheon Needs attention
  1. First visit Done Jul 15
  2. MRI to establish acuity Overdue · due Jul 22 Pre-req
Overdue: MRI to establish acuity Due Jul 22 · MRI not scheduled yet · AI followed up 3× (last 3 h ago)
  • Followed up again on the mri to establish acuity; escalates to the front desk after one more try
  • Called the patient, left a voicemail

Mark Kim

Lower back pain under evaluation · Not dermatomal · stable

Recover without surgery: therapy and regular check-ins

Lower back pain UnitedHealthcare MRDr. Marcus Reyes Needs attention
  1. First visit Done Jun 29
  2. Flexion-extension X-rays Done Jul 11 Pre-req
  3. Physical therapy · 6 weeks Done Aug 24 Follow-up
  4. 6-week check-in Missed · due Aug 17 Follow-up
  5. 12-week check-in Done Sep 28 Follow-up
Missed: 6-week check-in Due Aug 17 · Not booked by the patient · AI followed up 4× (last 2 d ago)
  • Followed up again on the 6-week check-in; escalates to the front desk after one more try
  • Reminder sent for: 12-week check-in

Grace Thomas

T11 compression fracture · Acute · TLICS 4

Heal in a brace; repeat imaging at 6–8 weeks

Compression fracture Workers' Comp (State Fund) MRDr. Marcus Reyes Needs attention
  1. First visit Done Jul 27
  2. MRI to establish acuity Done Aug 3 Pre-req
  3. TLICS score Done Aug 4 Pre-req
  4. Brace fitted Done Aug 6 Follow-up
  5. 6–8 week follow-up + repeat imaging Missed · due Aug 24 Follow-up
  6. Bone density scan (DEXA) Overdue · due Aug 17 Follow-up
Missed: 6–8 week follow-up + repeat imaging Due Aug 24 · Not booked by the patient · AI followed up 4× (last 1 d ago)
Overdue: Bone density scan (DEXA) Due Aug 17 · Referral sent; patient has not booked · AI followed up 3× (last 2 d ago)
  • Followed up again on the 6–8 week follow-up + repeat imaging; escalates to the front desk after one more try
  • Followed up again on the bone density scan (dexa); escalates to the front desk after one more try

Steven Lee

L4–5 disc herniation · Radiculopathy · dermatomal

Avoid surgery if conservative care works; microdiscectomy if it does not

Lower back pain Medicare EPDr. Elena Park Needs attention
  1. First visit Done Jul 14
  2. MRI correlation Done Jul 14 Pre-req
  3. Conservative care as the plan requires Done Sep 1 Pre-req
  4. Medical-necessity documentation Overdue · due Sep 4 Pre-req
  5. 6-week follow-up visit Done Sep 1 Follow-up
  6. Medical-necessity note Due Sep 22 Pre-req
  7. Pre-surgery consult Due Sep 28 Pre-req
  8. Surgery Due Oct 12
No citable public criteria checklist · verify with plan Medicare · UHC (InterQual, not public) · Medicare Noridian (no LCD for decompression) · Medicare Advantage · other plans
Conservative care as the plan requiresDone
Medical-necessity documentationOverdue
1 of 2 needed
Overdue: Medical-necessity documentation Due Sep 4 · Documentation not complete yet · AI followed up 3× (last 4 d ago)
  • Followed up again on the medical-necessity documentation; escalates to the front desk after one more try
  • Requested the missing records

Ana Adams

C6 radiculopathy (C5–6 disc) · Radiculopathy · dermatomal

Avoid surgery if conservative care works; ACDF if it does not

Neck pain Blue Shield of California MRDr. Marcus Reyes Waiting on insurer
  1. First visit Done Jul 24
  2. MRI of the cervical spine Done Jul 24 Pre-req
  3. Conservative care as the plan requires Done Sep 11 Pre-req
  4. Medical-necessity documentation Done Sep 14 Pre-req
  5. 6-week follow-up visit Missed · due Sep 11 Follow-up
  6. Surgery pre-approval · Blue Shield of California In progress Pre-req
  7. Pre-surgery consult Due Oct 8 Pre-req
  8. Surgery Due Oct 22
No citable public criteria checklist · verify with plan Blue Shield of California · UHC commercial (InterQual) · Medi-Cal (no cervical entry) · other Medicare Advantage plans
Conservative care as the plan requiresDone
Medical-necessity documentationDone
2 of 2 needed
Missed: 6-week follow-up visit Due Sep 11 · Not booked by the patient · AI followed up 4× (last 8 h ago)
  • Followed up again on the 6-week follow-up visit; escalates to the front desk after one more try
  • Sent two open times this week

Patricia Thomas

T11 compression fracture · Acute · TLICS 2

Heal in a brace; repeat imaging at 6–8 weeks

Compression fracture UnitedHealthcare EPDr. Elena Park Needs attention
  1. First visit Done Aug 25
  2. MRI to establish acuity Done Aug 31 Pre-req
  3. TLICS score Done Sep 2 Pre-req
  4. Brace fitted Done Sep 4 Follow-up
  5. 6–8 week follow-up + repeat imaging Missed · due Oct 13 Follow-up
  6. Bone density scan (DEXA) Done Sep 15 Follow-up
Missed: 6–8 week follow-up + repeat imaging Due Oct 13 · Not booked by the patient · AI followed up 4× (last 4 d ago)
  • Followed up again on the 6–8 week follow-up + repeat imaging; escalates to the front desk after one more try
  • Sent two open times this week

Susan Park

Recovering from spine surgery · Recovery

Full recovery and return to activity

After surgery Anthem Blue Cross BMDr. Brandon McCutcheon Needs attention
  1. Surgery Done Aug 27
  2. 2-week wound check Booked Nov 27 Post-op
  3. 6-week recovery visit Done Oct 8 Post-op
  4. Post-op physical therapy Done Nov 19 Post-op
  5. 3-month visit + X-ray Missed · due Nov 25 Post-op
Missed: 3-month visit + X-ray Due Nov 25 · Not booked by the patient · AI followed up 1× (last 1 d ago)
  • Reminder sent for: 2-week wound check on Fri Nov 27
  • Followed up again on the 3-month visit + x-ray; escalates to the front desk after one more try

Patricia Gomez

L4–5 disc herniation · Radiculopathy · dermatomal

Avoid surgery if conservative care works; microdiscectomy if it does not

Lower back pain Cigna BMDr. Brandon McCutcheon Waiting on insurer
  1. First visit Done Oct 21
  2. MRI correlation Done Oct 21 Pre-req
  3. Medications Done Nov 17 Pre-req
  4. Guided (provider-directed) exercise 4 of 6 weeks Pre-req
  5. Injection at the surgical level Overdue · due Nov 25 Pre-req
  6. 6-week follow-up visit Due Dec 9 Follow-up
  7. Surgery pre-approval · Cigna In progress Pre-req
  8. Pre-surgery consult Due Jan 5 Pre-req
  9. Surgery Booked Dec 1
Cigna / eviCore checklist Cigna · As supplied to Jeff · policy link to add · any 2 of 3
MedicationsDone
Guided (provider-directed) exercise4 / 6 wk
Injection at the surgical levelOverdue
1 of 2 needed
Overdue: Injection at the surgical level Due Nov 25 · Injection not scheduled yet · AI followed up 1× (last 3 d ago)
  • Followed up again on the injection at the surgical level; escalates to the front desk after one more try